Conservatory Roof ReplacementDerby

Conservatory Roof Rules in Derby

Planning is about looks and neighbours. Building Regulations deal with structure, safety and heat loss. Replace a conservatory roof and, in most cases, only the Building Regulations side has anything to say.

A guide to the rules in England, not legal advice.

A red-brick mill with a square tower on a riverbank, a low road bridge and willow trees further down the water

The rules in short

Planning permission

Rarely needed

Most changes to a conservatory roof fall within permitted development. The exceptions are conservation areas, listed buildings, flats, and roofs that change the look of the building a lot.

Building Regulations

Expect it for tiles

New glass or sheets normally leave the conservatory's exempt status alone. Put an insulated tiled roof on and that status usually goes, which brings in an application.

Your situation at a glance

Find the row closest to your home. If two rows apply, the stricter one wins.

Your situationPlanning permissionBuilding Regulations
Like-for-like glass or polycarbonate on an ordinary houseSeldomSeldom, as long as it remains a conservatory
Solid, insulated tiled roof on an ordinary houseSeldom, unless the roof looks very differentAlmost always
Any new roof in one of Derby's 16 conservation areasCheck with the council firstDepends on the roof, as above
A listed buildingAsk the council before any changeDepends on the roof, as above
A flat or maisonetteNo householder permitted development, so ask the councilDepends on the roof, as above

Why a solid roof needs Building Regulations approval

Plenty of people believe conservatories sit outside the Building Regulations altogether. That is only true while it satisfies the whole checklist set out in Schedule 2 of the Building Regulations 2010. It must be on the ground floor and have a floor area of 30 square metres or less. Its glazing has to meet the safety rules in Part K. There must be a proper outside-grade door, window or wall between it and the house, and the central heating cannot run into it.

Why those boxes? Because the law treats a conservatory as a light, mostly see-through structure kept apart from the warm part of the house. Turn it into something heavier and warmer and that logic falls away.

Government guidance from 2013 makes the same point from the other side: alter an exempt conservatory and it keeps its pass only if what you end up with is still a conservatory. Take away a large share of the glass in the roof or walls and the pass may be lost. The LABC view is plainer still. In its guidance, a conservatory that gains an insulated solid roof has lost its exemption, and Approved Document L, the energy part of the rules, counts the job as building work.

The two things an inspector cares about

Load and insulation. An inspector will want proof that what is already standing, meaning the frame, the posts beside any doors and the footings underneath, is strong enough for a tiled roof, and that the new roof keeps heat in to the required standard. A fitter worth hiring looks at the base and frame before writing a quote for exactly this reason.

Who to ask in Derby

Planning questions in the city go to Derby City Council. When a tiled roof needs Building Regulations sign-off, you, or more often your fitter, can apply to the city's own building control service or go through a registered building control approver, a private body licensed to carry out the same checks.

The city's building control is run by the Derbyshire Building Control Partnership, which Derby shares with several Derbyshire councils. It does not publish standard charges; it quotes on request and states an hourly rate of £93, so ask it, or whoever is fitting the roof, for the figure. Our building control fee study sets that beside what a neighbouring council publishes.

Conservation areas

The council lists 16 conservation areas. They include Victorian suburbs such as Railway, Arboretum, Little Chester, Strutts Park, Hartington Street, Highfield Cottages, Leylands and Nottingham Road, and former village centres including Darley Abbey, Mickleover, Spondon, Allestree and Markeaton. A like-for-like roof is usually still fine, but a change in how the roof looks deserves a check first.

You can see the full list on the council's conservation areas page.

Two ways to apply

A tiled roof application normally takes one of two forms, and fitters often have a favourite.

Full plans

Plans go in first and are assessed in advance, A decision is due within five weeks, or within two months if you consent to the longer period. Safer, because problems show up on paper, and it ends with an approval followed by a completion certificate.

Building notice

Skip the drawings; the roofer can begin two days after the notice is lodged, and the inspector judges the work as it goes. Fine for straightforward jobs, though if something fails an inspection it is your cost to put right.

Rules people trip over

My conservatory already has a building control certificate. Do I need another?

If you are fitting a solid roof, yes, in most cases. The new roof is fresh building work, and building control will look at it on its own terms, including whether the frame and foundations can carry it.

Can my fitter deal with building control for me?

Often, yes. Plenty of firms submit the application as part of the job. Make sure your quote says who is applying and whether the council's charge is included, so nothing is left unpaid at the end.

A tiled roof was fitted before we bought the house, with no sign-off. Now what?

Councils run a process called regularisation for work done without approval. If you are fitting a new roof yourself, apply first: it is far simpler, and the paperwork is ready when you come to sell.

Does keeping the doors between the house and conservatory help?

Keeping the conservatory separated from the house by external-quality doors or windows is one of the conditions for it to be exempt in the first place. With a solid roof on, though, the exemption usually falls away anyway, so treat the roof as needing approval.

Outside England: Wales and Scotland

This page follows the English rules because Derby is in England. Across the border in Wales the thinking is much the same; Welsh Government guidance lists when conservatories are exempt, and a tiled roof that ends the glass-house character generally means approval is needed.

Scotland runs its own system. The size limit for skipping a building warrant is 8 square metres, which most conservatories exceed, and a solid roof generally needs a warrant before work begins. The building notice option does not exist there.

Where this comes from

Rules clear? Get a quote

A good fitter will tell you at the survey whether your roof needs an application, and can usually handle it for you.

No charge to you. We line up a roof firm that works around your postcode, tell you who they are, and hold on to your details until you agree. How it is arranged

Your details
Get a quote